Translation of "product cost estimates" to Chinese language:
Dictionary English-Chinese
Examples (External sources, not reviewed)
Cost estimates | |
(a) Estimates of the gross national product | (a) 国民生产总值估计数 |
PRELIMINARY COST ESTIMATES | 初步费用估计 |
Original cost estimates | 原定费用概数 |
Original cost estimates | 原始费用 |
Original cost estimates | 原订 |
Cost estimates Actual cost Troop accommodations, land | 늿뛓힡쯞,췁뗘 240 000 181 100 58 900 |
Revised cost estimates Increase | 订正费用概数 |
Cost estimates of the proposals | 五. 各项建议的费用估计数 |
Change from previous cost estimates | 同上次费用估计数相比的变动 |
Table 6. Cost recovery income estimates | 表6 费用回收估计数 |
A 51 508 Revised cost estimates | 6. 뿕훐튵컱 45ꎭ51 |
Revised cost estimates for UNTAES and estimates for the Civilian Police Support Group | 东斯过渡当局的订正费用概算和民警支助小组的费用概算 |
Table 2 Cost estimates design development phase | 费用估计 设计阶段 |
Table 3 Cost estimates construction documents phase | 表3 |
Post session documentation (ACEFRS) B. Cost estimates | B. 费用概算 1996年3月 1996年8月 |
Cost estimates design development and construction documents phases | 费用估计 设计阶段和施工文件阶段 |
Cost estimates 1 July 1998 30 June 1999 | 1997年7月1日至 |
The estimates are based on individual sector contributions to gross domestic product (GDP). | 有关估计数字均以每一部门对国内生产总值的贡献为依据 |
The cost estimates provided 17,986,800 for common staff costs. | (b) 맺볊뫍떱뗘릤ퟷ죋풱. 22 193 500 |
Cost estimates for the period from 1 January to | 뻼쫂맛달풱 1 1 |
The revised cost estimates are shown in column 2. | 订正费用概数载于第2栏 |
Cost estimates for the period from 1 January 1998 to | 1998쓪1퓂1죕훁1999쓪12퓂31죕웚볤 |
A. Mission specific cost parameters Previous submission Proposed estimates Period | A. 쳘엉췅쳘뚨럑폃닎쫽 |
Cost estimates for the period from 1 July 1998 to | 1997年7月1日至 |
The cost estimates provided for the hire of three helicopters. | 费用概数包括租用三加直升机的租金 |
The cost estimates provided 1,128,000 in the cost estimates for medical supplies however expenditure was lower ( 209,100) than was anticipated at the time of preparation of the cost estimates. Some of the unutilized balance of 918,900 resulted from the reimbursement of one contingent for self sustainment. | 76. 튽쇆폃욷ꆣ럑폃룅쯣뇠쇐1 128 000쏀풪폃폚튽쇆폃욷,떫쫇횧돶뇈퓚뇠훆럑폃룅쯣쪱풤웚뗄뗍(209 100쏀풪)ꆣ캴쪹폃폠뛮918 900쏀풪훐뗄튻킩쫇평폚뛔튻룶ퟔ룸ퟔퟣ뗄쳘잲뛓뎥뮹쫽뛮ꆣ |
2(b) Technical cooperation delivery and support cost income estimates 14 | 2(b) 技术合作执行额和支助费用收入概算 11 |
The cost estimates include a 25 per cent delayed recruitment factor. | 费用估计数含25 的延迟部署因数 |
2(b) Technical cooperation delivery and support cost income estimates 13 | 2(b) 技术合作执行额和支助费用收入概算 11 |
A. Mission specific cost parameters Previous submission Average strength Proposed estimates | A. 쳘엉췅쳘뚨럑폃닎쫽 |
Details of the cost estimates are contained in annex I below. | 쯹탨ힷ볓쫽 1 4 5 1 1 6 10 2 |
Cost estimates for the completion of the liquidation tasks summary statement | 完成清理结束工作的估计费用 总表 |
Cost estimates for the completion of the liquidation tasks supplementary information | 完成清理结束工作的估计费用 补充资料 |
A summary of the cost estimates for this period is presented in annex I and the cost parameters and supplementary information thereon in annex II, sections A, B and C. The estimates reflect a decrease of 2,602,700 compared to the cost estimates for the prior 12 month period. | 这段期间的费用概算摘要载于附件一,其费用参数和补充资料载于附件二,A B和C节 同上一个12个月期间的费用概算相比,此概算减少了2 602 700美元 |
Supplementary information on the cost estimates is presented in annex II. Section A provides mission specific cost parameters non recurrent requirements are provided in section B and supplementary explanations on the cost estimates are provided in section C. | 附件二载列概算的补充资料 A节提供关于观察团特定费用参数 B节提供所需非经常费用 C节提供费用概算的补充说明 |
Supplementary information on the cost estimates is presented in annex II. Section A provides mission specific cost parameters non recurrent requirements are provided in section B and supplementary explanations of the cost estimates are provided in section C. | 关于费用概算的补充资料载于附件二 A节载列具体特派团的费用参数 非经常所需费用列于B节 费用概算的补充解释载于C节 |
Cost estimates for the support for elections for the twelve month period | 12个月期间支助选举的估计费用 |
IV. Cost estimates for the completion of the liquidation tasks summary statement | 四. 完成清理结束工作的估计费用 总表 33 |
V. Cost estimates for the completion of the liquidation tasks supplementary information | 五. 完成清理结束工作的估计费用 补充资料 36 |
Information on the cost estimates is contained in annexes IV and V. | 附件四和五载有费用估计数的资料 |
Cost estimates for the period from 27 March to 30 June 1998 | 1998年3月27日至6月30日期间费用概算 |
The cost estimates provided 5,400 for the purchase of 18 water tanks. | 费用概数5 400美元用于购买18个储水罐 |
20. Supplementary information on the cost estimates is presented in annex II. Annex II.A provides mission specific cost parameters. | 20. 关于费用估计数的补充资料载于附件二 附件二.A提供特定任务费用参数 |
Supplementary information in respect of the cost estimates is presented in annex III. Section A provides mission specific cost parameters section B provides a description of non recurrent costs and section C provides additional information on the cost estimates. | 费用概算的补充说明见附件三 A节列出特派团特定的费用参数,B节列出非经常性费用,C节列出费用概算的补充说明 |
Related searches : Product Cost Collector - Product Cost Management - Product Cost Fixed - Product Cost Planning - Product Cost Savings - Product Cost Reduction - Product Cost Calculation - Total Product Cost - Product Cost Accounting - Product Cost Controlling - Product Target Cost - Cost Effective Product - Sales Estimates - Biased Estimates