Translation of "final cost estimate" to Chinese language:


  Dictionary English-Chinese

Cost - translation : Estimate - translation : Final - translation :

  Examples (External sources, not reviewed)

The cost estimate for rental of helicopters provided for 15,755 flying hours.
租赁直升机的经费估计数可提供15 755飞行小时
I can't calculate the final cost without first discussing it with our contractors.
不先與我們的承包商討論的話我無法計算出最後的費用
Iraq states that the method used by Jordan to estimate the cost of preventative expenditures is neither reasonable nor appropriate.
304. 小组过去注意到 存在证据显示伊朗的部分地区受到科威特油井大火的烟雾影响
In short, even our moderate estimate may significantly underestimate the cost of America s involvement in Iraq. And our estimate does not include any of the costs implied by the enormous loss of life and property in Iraq itself.
简而言之 即使是我们 温和 估计也可能大大低估美国介入伊拉克的成本 而且 我们的估计并不包含在伊拉克境内巨大的生命和财产损失的任何费用
The collection of data necessary to estimate savings has been difficult as some organizations did not know the cost of their payroll systems.
难以收集估计节省额所必需的数据 因为有些组织并不知道其发薪系统的费用
Implementation costs are very difficult to estimate, as they represent the cost to adapt standard products to the specific client's environment and needs.
实施费用很难估计 因为实施费用为使标准产品适应具体用户的环境和需求的费用
The cost estimate for military contingents amounts to 141,117,900, an increase of 1,569,600 (1.1 per cent) over the apportionment for the current period.
27. 军事特遣队所需经费估计数为141 117 900美元 比本期间分配的经费增加1 569 600美元(1.1 )
The Advisory Committee was informed that UNOCI plans to implement 100 quick impact projects during the 2005 06 period at a total cost estimate of 1 million.
咨询委员会获悉 联科行动计划在2005 06期间执行100个速效项目 成本估计总数为100万美元
Yet the cost would be anything but negligible. The EU s own estimate is about 60 billion annually , which is almost certainly a vast underestimate (its previous estimate was almost twice as much), since it requires the EU to make the reductions in the smartest way possible.
在整个二十一世纪认真贯彻执行减少欧盟二氧化碳排放20 只不过将会把由于全球变暖而造成的温度升高在本世纪末的时候推迟两年 从2100年推迟到2102年 这一变化可以忽略不计 但是其成本绝对不可不计 欧盟自己的估计是大约每年600亿欧元 这肯定还是低估了 (它先前的估计几乎是两倍) 因为这要求欧盟用最为聪明的方法减排
One is a low estimate, and one is a high estimate.
一个低一个高
The low estimate is the nuclear energy industry estimate of nuclear.
低的这个统计数据是核工业体系 统计的
The total cost estimate for military and civilian police for 2005 06 is 166,403,800, an increase of 5,145,000 (3.2 per cent) in comparison with the apportionment for the current period.
25. 2005 06年期间军事人员和民警费用估计总数为166 403 800美元 比本期间分摊的资金增加了5 145 000美元(3.2 )
This feature will be made available in the second wave of enhancement of the Atlas system subject to a final cost evaluation.
第二波增强后的Atlas系统将具备这项功能 唯需先对其最后费用进行评估
b Estimate.
b 估计
The purpose of the second performance report on the budget for the International Criminal Tribunal for Rwanda is to provide an estimate of the final level of resources required for the biennium.
1. 提交卢旺达问题国际刑事法庭预算第二次执行情况报告 目的是提出两年期所需资源的最后估计数
The final budget for the biennium 2004 2005 amounted to 38,100, whereas the budget estimate for the biennium 2006 2007 amounts to 338,100, constituting, without explanation, an increase of 887 per cent.
2004 2005两年期的最后预算为38,100美元 而2006 2007两年期的概算为338,100美元 即未经解释增加了887
This means the estimate for 2002 is likely to be an over estimate.
这意味着对年数据的估算可能会略为偏高
This means the estimate for 2002 is likely to be an over estimate.
这意味着对2002年数据的估算可能会略为偏高
In fact, he forecasted that the price of doing nothing could even approach 20 of GDP. (Never mind that this cost estimate is probably wildly overestimated most models show about 3 damages.)
但是巴罗索的关键论点是 与无所作为相比 这一成本还是低的 实际上 他预计无所作为的代价 甚至可能接近GDP的20 (他们从来就没有注意这一估计本身就大大偏高 大多数的模式估计损失为大约3 )
Final sales to households, businesses, and foreign buyers rose at only a 1.1 annual rate, even slower than earlier in the year. And the preliminary estimate for annual GDP growth in the first quarter of 2012 was a disappointing 2.2 , with only a 1.6 rise in final sales.
此时此刻 美国经济在低增长和高失业的围追堵截下步履蹒跚 去年产出增长率只有1.5 真实人均GDP甚至比2007年底经济收缩开始时还要低 尽管2011年4季度GDP增长年率达到了3 但其中一半是存货积累贡献的 面向家庭 企业和外国消费者的最终消费增长年率只有1.1 甚至还不如2011年上半年 而且之前对2012年GDP1季度增长年率的预测只有可怜的2.2 仅增长了1.6
The final report had provided estimates for all the cost elements of the funding requirement for the 2006 2008 replenishment of the Multilateral Fund.
134. 最后报告中估算了多边基金2006 2008年增资所需资金的所有费用项目
Subject to a review under Article 8 and the acceptance of the revised estimate by the expert review team, the revised estimate shall replace the adjusted estimate.
82. 在修订的估计数有待接受第八条之下的审评并得到专家审评组接受的前提下 修订的估计数应取代调整的估计数
With regard to the costs of amputation surgery, the Panel considers that Kuwait's estimate is not reasonable since it is based on the average cost of surgery at the Mubarak Al Kabeer Hospital, which is higher than the average cost at the Al Razi Hospital, where the surgery was actually performed.
447. 小组注意到 科威特采用计算机模型就海岸资源损害进行的估计基本符合现有的信息 例如卫星图像 调查报告 图片以及证人的证词
When examining the cost of conflict, the Copenhagen Consensus economists estimate the actual costs of global military expenditure. If one also takes into account the lives lost in battle, the estimates increase by about 50 .
在考察冲突的成本时 哥本哈根共识经济学家估算的是全球军事开支的实际成本 如果我们还纳入战争中的生命损失 那么估计值还会提高50 左右
The analysis of data provided by organizations leads us to estimate that the average payroll cost per employee per year currently borne by the United Nations system organizations is in the range of US 200 250.
通过分析各组织提供的数据 我们估计 联合国系统各组织负担的每个雇员年均发薪费用在200 250美元之间
b 2003 World Bank estimate.
b 2003年世界银行估计数
In the time between their dispatch to the Parties and the Open e Ended Working Group, an effort will be made to obtain an estimate of the cost indicative costing to carry out of such a study.
在分别向各缔约方和向不限成员名额工作组发送这些职权规定草案之间的时期内 将努力估算此种可行性研究将会涉及的费用
Germany alone spends more than 3 billion annually, or 167 per ton of avoided CO2 emissions, which is more than 37 times the cost of carbon reductions in the European Union Emissions Trading System. And the estimate of avoided emissions ignores indirect land use changes, making the likely real cost at least eight times higher.
与此同时 我们却为生物燃料付出了高昂的代价 仅德国一地每年就需多支出超过30亿美元 合每吨二氧化碳减排多支出167美元 超过了欧盟排放交易系统碳减排定价的37倍 而对减排量的估算并未计算间接的用地变化 因此可能的实际成本至少在8倍以上
The EU promised to cut its CO2 emissions by 20 by 2020, at a cost that the Commission s own estimates put at about 0.5 of GDP, or roughly 60 billion per year. This is obviously a hefty price tag at least a 50 increase in the total cost of the EU and it will likely be much higher (the Commission has previously estimated the cost to be double its current estimate).
例如 欧洲委员会主席巴罗索在今年早些时候提出欧盟应对气候变化建议的时候就采用了这一论点 欧盟承诺到2020年的时候将其二氧化碳的排放削减20 欧盟委员会自己估计其成本是每年大约600亿欧元 大约为其GDP的0.5 明显这是一个巨大的代价 相当于欧盟总成本提高至少50 而且 还有可能更高(欧盟委员会以前估计成本是目前估计的一倍)
Estimate 2002 2003 to be determined
2002 2003年估计数 待定
Estimate 2002 2003 to be determined
2002 2003年估计数 待定
Estimate 2002 2003 to be determined
2002 2003估计数 待定
Estimate by UNESCO Institute for Statistics.
教科文组织统计所的估计数
Recapitulation of the May 2005 estimate
1. 2005年5月估计的要点
The Secretary General reported in April 2005 that the latest cost estimate for UNDC 5 was 552 million (exclusive of management and bond costs), plus an additional 17 million contingency as suggested by the United Nations programme manager.
24. 秘书长在2005年4月报告说 UNDC 5的最新费用估计数为5.52亿美元 不包括管理和债券的费用 再加上联合国方案主管所建议的另外一笔1 700万美元的紧急费用
As a principle to achieve conservative estimates, the calculation of an adjustment for a commitment period year should not result in an emission estimate that is lower or a removal estimate that is higher than that originally submitted by the Party, and an adjustment for an estimate of the base year should not result in an emission estimate that is higher than the originally submitted estimate.
50. 为计算调整数而选择的调整方法和适用的清单参数 应产生稳妥的排放量估计数 也就是说 与有关缔约方可能的真实排放量或清除量相比 基准年排放量和承诺期某一年的汇清除量估计数不过高 承诺期某一年的排放量估计数也不过低
It was further requested that the secretariat provide Parties with an estimate of the cost of funding the participation of Parties not operating under paragraph 1 of Article 5 as identified by TEAP in its report on administrative issues.
日本代表还要求秘书处向缔约方提供关于技经评估组行政问题报告中确定的资助不按第5条第1款行事的缔约方参加会议的费用估计
The cost estimate for civilian police provides for MSA, clothing allowance, and deployment travel of civilian police based on the projected phased deployment of 437 civilian police by October 2005, within a total authorized strength of 715 civilian police.
14. 民警费用估计数用作民警的生活津贴 服装津贴和部署旅费 民警人数按核定总人数715人 预计到2005年10月分阶段部署437人计算
Before any proposal which involves expenditures is approved by the Committee or by its subsidiary bodies, the Secretary General shall prepare and circulate to its members, as early as possible, an estimate of the cost involved in the proposal.
委员会或其附属机构通过任何涉及经费问题的提案之前 秘书长应尽早编制并向其委员分发有关提案所涉费用的概算
The total estimated cost of the initial project, based on the final construction documents submitted by the design firm, amounts to 8,992,700 (at 2005 prices), including construction costs of 6,697,600.
17. 根据设计公司提出的最后施工图 原定工程 按2005年价格计算的 费用估计数总额为8 992 700美元 其中包括工程费6 697 600美元
Because I could go on for about two hours with evidence of people's inability to estimate odds and inability to estimate value.
因为我可以在这里讲两个小时 举例子 证明人类在估计概率和价值方面的无能表现
The total estimate of 569 million is 80 per cent higher than the preliminary estimate of 315.8 million made in September 2002.
5.69亿美元的估计数总额较2002年9月提出的3.158亿美元的初步估计数高出80
The low ball estimate is 35 million.
保守估计是三千五百万
d Estimate by UNESCO Institute for Statistics.
d 教科文组织教育部门统计所估计数
Once these risks are identified and prioritised, a more detailed and focused assessment on how to improve the reliability of specific munition natures could be undertaken and an approximate cost estimate to implement this increase in reliability could be determined.
一旦查明并按优先顺序列出这些风险 即可着手对如何提高具体性质弹药的可靠性开展更加详细和重点突出的评估 并可确定提高可靠性的估计费用

 

Related searches : Final Estimate - Cost Estimate - Final Cost - Material Cost Estimate - Overall Cost Estimate - Rough Cost Estimate - Cost Estimate For - Preliminary Cost Estimate - Standard Cost Estimate - A Cost Estimate - Initial Cost Estimate - Unit Cost Estimate - Inventory Cost Estimate - Revised Cost Estimate