Translation of "low maintenance requirements" to Chinese language:
Dictionary English-Chinese
Maintenance - translation :
Examples (External sources, not reviewed)
| Resource requirements (before recosting) 182,200, at maintenance level | (重计费用前)所需资源 182 200美元 按维持原有活动水平 |
| Resource requirements (before recosting) 95,100, at the maintenance level | (重计费用前)所需资源 95 100美元 按维持原有活动水平 |
| Resource requirements (before recosting) 109,200, at the maintenance level | (重计费用前)所需资源 109 200美元 按维持原有活动水平 |
| Resource requirements (before recosting) 212,600, at the maintenance level | (重计费用前)所需资源 212 600美元 按维持原有活动水平 |
| Resource requirements (before recosting) 474,500, at the maintenance level | (重计费用前)所需资源 474 500美元 按维持原有活动水平 |
| Resource requirements (before recosting) 318,600, at the maintenance level | (重计费用前)所需资源 318 600美元 按维持原有活动水平 |
| Resource requirements (before recosting) 1,142,200, at the maintenance level | (重计费用前)所需资源 1 142 200美元 按维持原有活动水平 |
| Resource requirements (before recosting) 131,600, at the maintenance level | (重计费用前)所需资源 131 600美元 按维持原有活动水平 |
| Resource requirements (before recosting) 315,500, at the maintenance level | (重计费用前)所需资源 315 500美元 按维持原有活动水平 |
| 9.105 Post requirements are proposed at the maintenance level. | 9.105 员额所需经费是按原有水平编列的 |
| A major part of the budgetary requirements at headquarters is kept at the maintenance level. | 45. 总部所需预算中的主要部分保持在维持水平 |
| Among the low cost waste water treatment options available are anaerobic treatment systems, which have the advantage of simple construction and low cost maintenance. | 现存的低成本废水处理选择中有厌氧菌处理系统 其优点是易建造 维持费少 |
| 14.42 The requirements, at the maintenance level of 1,515,500, would provide for the continuation of five posts. | 14.42 所需资源按原水平保持不变 为1 515 500美元 将用于维持5个员额 |
| A major part of the budgetary requirements in the field offices is kept at the maintenance level. | 36. 外地办事处所需预算的主要部分保持在维持水平 |
| The Committee notes that the requirements for the maintenance of ProFi are now fully budgeted under infrastructure. | 委员会注意到 方案和财务管理信息系统所需维护费用现已完全列入基础设施项下的预算 |
| The unspent balance of 20,000 is attributable to lower requirements under the maintenance of information technology equipment. | 28. 经费产生未用余额20 000美元的原因是信息技术设备的维修经费降低 |
| Non post requirements of 26,300, at the maintenance level, would cover communications ( 9,200) maintenance of office automation equipment ( 10,100) office supplies ( 3,400) and replacement of office automation equipment ( 3,600). | 按原有水平编列非员额经费26 300美元 用于 通讯 9 200美元 办公室自动化设备维护 10 100美元 办公室用品 3 400美元 和办公室自动化设备更新 3 600美元 |
| Non post requirements, at the maintenance level of 43,200, would cover communications ( 11,200) maintenance of office automation equipment ( 20,200) office supplies ( 3,300) and replacement of office automation equipment ( 8,500). | 按原有水平编列非员额经费43 200美元 用于 通讯(11 200美元) 办公室自动化设备的维护(20 200美元) 办公室用品(3 300美元)和办公室自动化设备的更换(8 500美元) |
| Requirements were also lower than anticipated under maintenance services for laundry, catering, waste disposal and for perimeter fencing and gates. | 洗衣 伙食 废物处理 周边围墙和大门等维护服务所需经费也比预期的少 |
| The additional requirements of 2,600 relate to the acquisition of three laptops purchased during the period for the training sessions offset by lower requirements for the maintenance of information technology equipment. | 43. 所需经费增加2 600美元 因为为训练班购置了三台膝上型计算机 信息技术设备维修费减少 抵减了此项费用 |
| 14.62 The amount of 696,400, at the maintenance level, provides for the continuation of three posts. Non post requirements, at the maintenance level of 33,800 would cover travel of staff ( 21,100) maintenance of office automation equipment ( 9,200) and replacement of data processing equipment ( 3,500). | 14.62 按原有水平继续保持3个员额开列的经费为696 400美元 按原有水平开列的非员额经费33 800美元将用于 工作人员旅费 21 100美元 办公室自动化设备维护费(9 200美元) 以及数据处理设备更新费 3 500美元 |
| For the publication requirements in connection with the maintenance of suppliers' lists, see, for example, article XI (9) of the GPA. | 例如 关于涉及保持供应商名单的发布要求 参见 政府采购协定 第十一(9)条 |
| The decreased requirements also reflect lower than projected requirements under (a) rental and maintenance of premises ( 56,000) (b) miscellaneous services ( 5,400) (c) freight related costs ( 36,500) and (d) third party liability insurance ( 16,300). | 所需经费减少的另一原因是以下各项经费低于预计数 (a) 房地租金和维持费(56 000美元) (b) 杂项事务费(5 400美元) (c) 运费(36 500美元) (d) 第三方责任保险费 16 300美元 |
| Because the Commission did not support the specific proposal, the requirements for the maintenance of ProFi are now fully budgeted under infrastructure. | 由于委员会并不支持该具体提议 对于维护ProFi系统的要求 目前完全是在基础设施项下提供预算 |
| 14.25 Non post requirements for travel of staff ( 28,600), rental and maintenance of office and data processing equipment ( 60,300), communications ( 6,200), supplies and materials ( 6,400) and office automation equipment ( 15,100) are proposed at the maintenance level. | 14.25 建议按原有水平编列的非员额经费用于 工作人员旅费 28 600美元 租赁和维修办公及数据处理设备 60 300美元 通讯 6 200美元 用品和材料 6 400美元 和办公室自动设备 15 100美元 |
| The requirements for training provide for the training of 99 Mission personnel in the maintenance period from 1 July to 31 December 2005. | 18. 培训所需费用用于在2005年7月1日至12月31日维持期间对99名特派团人员进行培训 |
| As was indicated in paragraph 15 above, non staffing requirements for the maintenance of ProFi estimated at 465,200 are provided for under infrastructure. | 26. 如上文第15段所述 基础设施项下规定了估计为465,200美元的在维护ProFi系统方面所需的非工作人员配置费用 |
| Requirements for production and recurrent maintenance for 2006 2007 would amount to 58.6 million (including 4 million for computer equipment outside New York), mostly reflecting the mainstreaming of the maintenance cost of investment projects approved for 2004 2005. | 2006 2007年制作和经常性维护费用达58.6百万美元 包括用于纽约以外的计算机设备的4百万美元 主要反映了计入2004 2005年核定投资项目的维护费用的情况 |
| Reaffirming the special needs and requirements of countries with fragile forest ecosystems, including those of low forest cover countries, | 重申森林生态环境脆弱的国家 包括森林覆盖率低的国家的特殊需要和要求 |
| (j) Issuance of laissez passer and other travel documents, provision of official travel, shipment, related insurance requirements, and operation and maintenance of transportation facilities | (j) 发放通行证和其他旅行文件 提供公务旅行 装运和有关保险等事务 运营和维持运输设施 |
| At one extreme, low data rate sensors with only local or regional coverage on missions with low tracking and command requirements impose relatively low demands on the ground segment, possibly comprising only 10 per cent or less of total programme costs. | 一方面 在跟踪和指令要求不高的飞行任务中仅仅覆盖当地或区域的低数据数率传感器对地面部分的要求相对较低 后者大约仅占或不到总方案费用的10 |
| The provision also reflects requirements for the rental of vehicles pending acquisition of new vehicles, repairs and maintenance, liability insurance, spare parts and petrol, oil and lubricants necessary for the operation and maintenance of all vehicles and 10 workshops throughout the Mission area. | 经费中包括在采购新车辆之前租赁车辆 所有车辆的运转和维护所必需的修理和维护 第三方责任保险 零配件和汽油 机油和润滑油以及任务区内10个修配所的所需费用 |
| Non post requirements of 59,200, at the maintenance level, would cover consultant services to undertake evaluations focusing on programme implementation ( 19,900) travel of staff ( 21,200) communications ( 5,500) maintenance of office automation equipment ( 6,500) office supplies ( 3,400) and replacement of office automation equipment ( 2,700). | 按维持水平编列的非员额经费59 200美元 用于 为开展以方案执行情况为重点的评估活动而需的顾问服务(19 900美元) 工作人员旅费(21 200美元) 通信费(55 000美元) 办公室自动化设备维修费(6 500美元) 办公室用品(3 400美元)和替换办公室自动化设备(2 700美元) |
| Extrabudgetary resources are also derived from various sources of funding of Secretariat wide requirements for the rental and maintenance of premises, telecommunications services and travel services. | 预算外资源的来源还有秘书处内租赁和维修房舍 电信服务和旅行服务等项目所需经费的多种供资源 |
| 27.30 The amount of 2,307,500, at the maintenance level, provides for (a) the continuation of 10 posts ( 1,998,300) and (b) non post resources ( 309,200) to cover other operational requirements. | 27.30 款额为2 307 500美元的经费用于维持 (a) 10个员额(1 998 300美元)以及(b) 非员额费用(309 200美元) 用来支付其他业务经费 |
| Taking into account its recommendations in paragraph 16 above, the Committee recommends that the estimated budget requirements of 46,328,400 for the maintenance of the Mission be reduced by 686,600. | 考虑到上文第16段的建议 委员会建议将用于维持特派团的预算需要估计数46 328 400 美元减少 686 600美元 |
| Non post provisions primarily reflect increases related to requirements for communications and maintenance of equipment, as well as the replacement of the vehicle allocated to the office in Nairobi. | 非员额经费主要是通信和设备维修费增加 以及更换配给内罗毕司的车辆 |
| 1.36 The amount of 2,111,300 provides, at the maintenance level, for the salary and allowances of the Secretary General, travel requirements, general operating expenses, hospitality and furniture and equipment. | 1.36 2 111 300美元在维持现有水平的基础上 用于支付秘书长薪金和津贴 所需旅费 一般业务费 招待费及家具和设备费 |
| The non post requirements of 252,000, at maintenance level, would cover (a) general temporary assistance and overtime ( 185,800) to mitigate peak periods of work and (b) banking transaction costs ( 66,200). | 非员额经费保持不变 为252 000美元 用于支付下列费用 (a) 一般临时助理人员费用和加班费 185 800美元 以减轻高峰时期的工作压力 (b) 银行交易费用(66 200美元) |
| The increased requirements relate to the procurement and maintenance of 65 desktop computers and 41 portable computers to be used by the additional civilian and police personnel and the staff officers. | 19. 所需经费增加 因为需要采购和维护65台台式计算机和41台手提计算机 供新增文职和警务人员及参谋人员使用 |
| Specific policy instruments that can be considered include incentives, performance requirements, investment targeting, and the provision of public goods (notably low cost and high quality infrastructure). | 可加以考虑的一些具体的政策手段包括奖励措施 业绩要求 投资定向以及提供公益设施(尤其是低成本和高质量的基础设施) |
| The network and telecommunication resource requirements for the new building will be included in the proposed programme budget for the biennium 2008 2009 under the section entitled Construction, alteration, improvement and major maintenance. | 将把新建筑所需网络和电信经费列入2008 2009两年期拟议方案预算题为 建筑 改建 装修和主要维修费 的一款项下 |
| The combination of low investment electricity generation for households and the ability to sell surpluses, scale up output, and access pre existing distribution and maintenance networks bridges a crucial gap in the energy market. | 低投资家庭发电 剩余电量出售 扩大产能和利用现有的分销及维修网络可以填补能源市场的重要空白 这一简单理念能使世界各地成百上千万贫困的农村居民与全球经济接轨 积累资本并改善他们的生活 |
| The requirements for the United Nations Office at Vienna for these physical upgrades are included under section 32, Construction, alteration, improvement and major maintenance of the proposed programme budget for the biennium 2006 2007. | 联合国维也纳办事处更新这些实物所需的经费列于2006 2007两年期拟议方案预算第32款 建筑 改建 改善和重大维修 |
| Manual procedures were criticized as being overly bureaucratic, with low levels of delegated authority, many levels of review and requirements for several signatures, even after review by contracts committees. | 手册程序被认为过分官僚 获授权限小 多重审查和多方签字 即使在合同委员会审查后还是一样 |
Related searches : Maintenance Requirements - Low Maintenance - Low Requirements - Low Maintenance Design - Low Maintenance Effort - Very Low Maintenance - Low In Maintenance - Low Maintenance Costs - Low Maintenance Solution - Low-maintenance Operation - Low Emission Requirements - Low Space Requirements - Low Power Requirements - Low Energy Requirements