Translation of "order cost estimate" to Chinese language:
Dictionary English-Chinese
Examples (External sources, not reviewed)
Cost Estimate | 费用概算 |
Cost estimate (United States dollars) | 概算(美元) |
Cost increase based on approved estimate | 按核定概算计算的费用增长 |
Table 1 Other travel Cost estimate Expenditure | 뇭1. 웤쯻싃럑 |
It cost me 30 over the estimate. | 让我超出预算30 |
Table 4 Maintenance services Item Cost estimate Expenditure | 릲 볆 6 118 000 4 827 600 1 290 400 |
Original cost estimate (A 52 799 Add.1) | 原定费用概算(A 52 799 Add.1) |
Cost Category estimate 1. Military personnel costs 36 900 | 1. 뻼쫂죋풱럑폃 36 900 |
(a) the current cost estimate of settling the liability | 偿还负债的现期成本估计 |
This estimate covers the cost of external audit services. | 本项概算供作外部审计事务费用 |
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost. | 估计费用中包括润滑油,以燃料费用总额的10 计算 |
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost ( 101,900). | 费用估计数包括润滑油的费用,以燃料费用总额的10 计算(101 900美元) |
The cost estimate for rental of helicopters provided for 15,755 flying hours. | 租赁直升机的经费估计数可提供15 755飞行小时 |
This estimate covers the cost of external audit service for the Force. | 这笔估计数为支付部队的外聘审计事务的费用 |
The estimate covers the cost of external audit for the Force ( 53,400). | 经费估计数用于支付为部队作外部审计的费用(53 400美元) |
The cost estimate provides for the emplacement travel of 81 civilian police at an average cost of 2,250 per person. | 费用概算用于81名民警的安置旅费,每人平均费用2 250美元 |
The cost estimate provides for requirements for 45 utility vehicles at an average cost of 75 per vehicle per month. | 费用概算用于45辆通用车辆,按每一车辆每月平均费用75美元计算 |
The estimate also includes the cost for oil and lubricants at 10 per cent of the cost of fuel ( 9,800). | 这笔估计数还包括机油和润滑油的费用,按燃油费用的10 计算(9 800美元) |
The estimate provides for the cost of commercial freight and cartage charges at an average cost of 20,000 per month. | 估计数是商营货运和搬运费,平均每月20 000美元 |
The cost estimate provides for requirements for medical evacuations outside the mission area at an average cost of 15,000 per month. | 费用估计数是往任务地区以外的医疗转移的经费,平均每月15 000美元 |
These are the estimate counts, in order for Kasai to win. | 这是为了让葛西当选的估计票数数 |
The cost estimate of 7,139,300 was based on requirements for 13,470,377 litres of petrol at an average cost of 0.53 per litre. | 웻폍 0.31 2 322 100 719 900 |
The cost estimate provides for additional requirements for the identification centres and district offices at an average cost of 6,500 per month. | 费用概算用于查验中心和地区办事处所需额外费用,每日平均费用6 500美元 |
The cost estimate provides for additional requirements for the identification centres and district offices at an average cost of 3,500 per month. | 费用概算用于查验中心和地区办事处所需额外费用,每月平均费用3 500美元 |
In view of the above, the cost estimate provides for the replacement of 167 vehicles at a cost of 8,254,125, including freight. | 鉴于上述情况,费用估计数将用于替换167部车辆,费用8 254 125美元,其中包括运费 |
VII. Revised cost estimate for the period from 1 July 1997 to 30 June 1998 | 七. 1997年7月1日至1998年6月30日期间的订正费用概算 23 25 5 |
10. The cost estimate is based on an average strength of 35 civilian police monitors. | 10. 费用估计数是根据35个民警监察员的平均人数 |
The previous estimate was based on the cost of petrol at 29 cents per litre. | 上一次估计数按每升汽油29美分计算 |
The estimate includes provision for lubricants at 10 per cent of total fuel cost ( 281,700). | 该费用估计数也包括为润滑油编列的经费(281 700美元)按燃料总费用的10 计算 |
The estimate includes provision for lubricants at 10 per cent of the total fuel cost ( 4,300). | 这笔概算包括为滑润剂编列的经费,占全部燃料费用的10 (4 300美元) |
The estimate also includes related freight charges at 12 per cent of the total cost ( 4,000). | 这笔概算还包括占全部费用12 的有关运费(4 000美元) |
The revised cost estimate reflects lower projected requirements for the period from January to June 1998. | 订正费用估计数反映了1998年1月至6月期间预计所需经费较低 |
The cost estimate is based on the actual expenditure data from the 1996 97 financial period. | 费用估计数是依据1996 1997年财政期间实际支出数据计算的 |
The estimate provides for the cost of production and technical services at an average cost of 10,000 per month. The estimate reflects a decrease in requirements from 12,000 per month in the prior period based on recent actual expenditure. | 估计数是制作和技术服务的经费,每月平均10 000美元,估计数根据最近实际开支,比前一期间每月12 000美元为少 |
The cost estimate provides for minor alterations and renovations for the establishment of nine identification centres at an average cost of 3,000 per centre. | 费用概算用于设置九个查验中心的小型改建和整修, 每个中心的平均费用3 000美元 |
The cost estimate provides for requirements for nine identification centres at an average cost of 2,000 per month, or 220 per month per centre. | 费用概算用于九个查证中心的所需费用,平均每月费用 2 000美元,或每中心每月220美元 |
The cost estimate provides for the purchase of one 250 line telephone exchange at a cost of 50,000 plus related freight charges at 12 per cent of the total cost ( 6,000). | 费用概算用于购买一套250条线的电话交换设备,费用为50 000美元,外加占全部费用12 的有关运费(6 000美元) |
The cost estimate includes related freight charges, calculated at 12 per cent of the total value ( 15,300). | 费用估计数中包括相关运费,按总值的12 计算(15 300美元) |
The revised cost estimate reflects reduced requirements at an average cost of 62,500 per month and is based on actual recorded expenditure until 31 December 1997. | 订正费用反映了所需经费每月平均减少62 500美元,并且根据截至1997年12月31日的实际入帐开支计算 |
The cost estimate provides for additional requirements for electricity for nine identification centres at an average cost of 4,000 per month, or 445 per month per centre. | 费用概算用于九个查验中心增加的所需电费,平均每月4 000美元,或每中心每月445美元 |
The cost estimate provides for requirements for spare parts, repairs and maintenance of other equipment not provided for elsewhere at an average cost of 75,000 per month. | 费用估计数为他处未提供的其他设备的备件 修理和保养提供所需经费,平均每月75 000美元 |
The revised cost estimate reflects higher actual requirements as indicated in actual recorded expenditure until 31 December 1997, resulting in an average cost of 25,000 per month. | 订正费用估计数反映了截至1997年12月31日止所需的实际入帐开支所显示的实际经费较高,每月平均为25 000美元 |
Table 1. Basic adjustment methods to obtain an emission removal estimate (in order of priority) | 表1. 排放量 清除量估计数的基本调整方法 (按优先顺序排列) |
The cost estimate provides for spare parts, repairs and maintenance of other equipment to be transferred to other missions. | 编列费用估计数用于将运往其它特派团的其它设备的备件 修理和保养 |
The cost estimate of 110,000 provides for 24 hour security coverage in Zagreb and Vukovar at 20,000 per month. | 估算费用110 000美元为萨格勒布和武科瓦尔提供24小时保安服务,每月费用为20 000美元 |
Related searches : Cost Estimate - Cost Order - Material Cost Estimate - Overall Cost Estimate - Rough Cost Estimate - Cost Estimate For - Preliminary Cost Estimate - Standard Cost Estimate - A Cost Estimate - Initial Cost Estimate - Unit Cost Estimate - Inventory Cost Estimate - Revised Cost Estimate - Construction Cost Estimate