Translation of "order cost estimate" to Chinese language:


  Dictionary English-Chinese

Cost - translation : Estimate - translation : Order - translation : Order cost estimate - translation :

  Examples (External sources, not reviewed)

Cost Estimate
费用概算
Cost estimate (United States dollars)
概算(美元)
Cost increase based on approved estimate
按核定概算计算的费用增长
Table 1 Other travel Cost estimate Expenditure
뇭1. 웤쯻싃럑
It cost me 30 over the estimate.
让我超出预算30
Table 4 Maintenance services Item Cost estimate Expenditure
릲 볆 6 118 000 4 827 600 1 290 400
Original cost estimate (A 52 799 Add.1)
原定费用概算(A 52 799 Add.1)
Cost Category estimate 1. Military personnel costs 36 900
1. 뻼쫂죋풱럑폃 36 900
(a) the current cost estimate of settling the liability
偿还负债的现期成本估计
This estimate covers the cost of external audit services.
本项概算供作外部审计事务费用
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost.
估计费用中包括润滑油,以燃料费用总额的10 计算
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost ( 101,900).
费用估计数包括润滑油的费用,以燃料费用总额的10 计算(101 900美元)
The cost estimate for rental of helicopters provided for 15,755 flying hours.
租赁直升机的经费估计数可提供15 755飞行小时
This estimate covers the cost of external audit service for the Force.
这笔估计数为支付部队的外聘审计事务的费用
The estimate covers the cost of external audit for the Force ( 53,400).
经费估计数用于支付为部队作外部审计的费用(53 400美元)
The cost estimate provides for the emplacement travel of 81 civilian police at an average cost of 2,250 per person.
费用概算用于81名民警的安置旅费,每人平均费用2 250美元
The cost estimate provides for requirements for 45 utility vehicles at an average cost of 75 per vehicle per month.
费用概算用于45辆通用车辆,按每一车辆每月平均费用75美元计算
The estimate also includes the cost for oil and lubricants at 10 per cent of the cost of fuel ( 9,800).
这笔估计数还包括机油和润滑油的费用,按燃油费用的10 计算(9 800美元)
The estimate provides for the cost of commercial freight and cartage charges at an average cost of 20,000 per month.
估计数是商营货运和搬运费,平均每月20 000美元
The cost estimate provides for requirements for medical evacuations outside the mission area at an average cost of 15,000 per month.
费用估计数是往任务地区以外的医疗转移的经费,平均每月15 000美元
These are the estimate counts, in order for Kasai to win.
这是为了让葛西当选的估计票数数
The cost estimate of 7,139,300 was based on requirements for 13,470,377 litres of petrol at an average cost of 0.53 per litre.
웻폍 0.31 2 322 100 719 900
The cost estimate provides for additional requirements for the identification centres and district offices at an average cost of 6,500 per month.
费用概算用于查验中心和地区办事处所需额外费用,每日平均费用6 500美元
The cost estimate provides for additional requirements for the identification centres and district offices at an average cost of 3,500 per month.
费用概算用于查验中心和地区办事处所需额外费用,每月平均费用3 500美元
In view of the above, the cost estimate provides for the replacement of 167 vehicles at a cost of 8,254,125, including freight.
鉴于上述情况,费用估计数将用于替换167部车辆,费用8 254 125美元,其中包括运费
VII. Revised cost estimate for the period from 1 July 1997 to 30 June 1998
七. 1997年7月1日至1998年6月30日期间的订正费用概算 23 25 5
10. The cost estimate is based on an average strength of 35 civilian police monitors.
10. 费用估计数是根据35个民警监察员的平均人数
The previous estimate was based on the cost of petrol at 29 cents per litre.
上一次估计数按每升汽油29美分计算
The estimate includes provision for lubricants at 10 per cent of total fuel cost ( 281,700).
费用估计数也包括为润滑油编列的经费(281 700美元)按燃料总费用的10 计算
The estimate includes provision for lubricants at 10 per cent of the total fuel cost ( 4,300).
这笔概算包括为滑润剂编列的经费,占全部燃料费用的10 (4 300美元)
The estimate also includes related freight charges at 12 per cent of the total cost ( 4,000).
这笔概算还包括占全部费用12 的有关运费(4 000美元)
The revised cost estimate reflects lower projected requirements for the period from January to June 1998.
订正费用估计数反映了1998年1月至6月期间预计所需经费较低
The cost estimate is based on the actual expenditure data from the 1996 97 financial period.
费用估计数是依据1996 1997年财政期间实际支出数据计算的
The estimate provides for the cost of production and technical services at an average cost of 10,000 per month. The estimate reflects a decrease in requirements from 12,000 per month in the prior period based on recent actual expenditure.
估计数是制作和技术服务的经费,每月平均10 000美元,估计数根据最近实际开支,比前一期间每月12 000美元为少
The cost estimate provides for minor alterations and renovations for the establishment of nine identification centres at an average cost of 3,000 per centre.
费用概算用于设置九个查验中心的小型改建和整修, 每个中心的平均费用3 000美元
The cost estimate provides for requirements for nine identification centres at an average cost of 2,000 per month, or 220 per month per centre.
费用概算用于九个查证中心的所需费用,平均每月费用 2 000美元,或每中心每月220美元
The cost estimate provides for the purchase of one 250 line telephone exchange at a cost of 50,000 plus related freight charges at 12 per cent of the total cost ( 6,000).
费用概算用于购买一套250条线的电话交换设备,费用为50 000美元,外加占全部费用12 的有关运费(6 000美元)
The cost estimate includes related freight charges, calculated at 12 per cent of the total value ( 15,300).
费用估计数中包括相关运费,按总值的12 计算(15 300美元)
The revised cost estimate reflects reduced requirements at an average cost of 62,500 per month and is based on actual recorded expenditure until 31 December 1997.
订正费用反映了所需经费每月平均减少62 500美元,并且根据截至1997年12月31日的实际入帐开支计算
The cost estimate provides for additional requirements for electricity for nine identification centres at an average cost of 4,000 per month, or 445 per month per centre.
费用概算用于九个查验中心增加的所需电费,平均每月4 000美元,或每中心每月445美元
The cost estimate provides for requirements for spare parts, repairs and maintenance of other equipment not provided for elsewhere at an average cost of 75,000 per month.
费用估计数为他处未提供的其他设备的备件 修理和保养提供所需经费,平均每月75 000美元
The revised cost estimate reflects higher actual requirements as indicated in actual recorded expenditure until 31 December 1997, resulting in an average cost of 25,000 per month.
订正费用估计数反映了截至1997年12月31日止所需的实际入帐开支所显示的实际经费较高,每月平均为25 000美元
Table 1. Basic adjustment methods to obtain an emission removal estimate (in order of priority)
表1. 排放量 清除量估计数的基本调整方法 (按优先顺序排列)
The cost estimate provides for spare parts, repairs and maintenance of other equipment to be transferred to other missions.
编列费用估计数用于将运往其它特派团的其它设备的备件 修理和保养
The cost estimate of 110,000 provides for 24 hour security coverage in Zagreb and Vukovar at 20,000 per month.
估算费用110 000美元为萨格勒布和武科瓦尔提供24小时保安服务,每月费用为20 000美元

 

Related searches : Cost Estimate - Cost Order - Material Cost Estimate - Overall Cost Estimate - Rough Cost Estimate - Cost Estimate For - Preliminary Cost Estimate - Standard Cost Estimate - A Cost Estimate - Initial Cost Estimate - Unit Cost Estimate - Inventory Cost Estimate - Revised Cost Estimate - Construction Cost Estimate